Skip to navigation
Schedule of sites (Chapter 4)
A) Community and Recreational Development – Schedule of Sites
| Alloa Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR1 |
Pine Grove |
Potential for horticultural use as part of South East Alloa Community
Healthy Living Project |
Clackmannanshire Council (Community Action Team) |
| CR2 |
Tile Factory/Incinerator |
Potential for Waste Transfer Station/ Materials Recycling Facility.
Access via Roads Depot site. Landscape Buffer Zone required to south and
east boundaries of the site. Subject to further evaluation (see paragraphs
1.69 and 1.70) |
Clackmannanshire Council |
| CR3 |
Greenside Street |
Vacant former mill school/shop. Potential for integrated museum/archive.
Feasibility study to be undertaken. |
Clackmannanshire Council |
| Alloa Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR4 |
Alloa Park |
Provision of playing fields as integral part of adjoining housing development
(See Residential Sites 11-14) |
Private |
| CR5 |
Alloa North West |
Provision of and suitable arrangements for long term management of recreational
land (See Residential Sites 12-16) |
Private |
| CR6 |
Alloa Docks |
Potential to develop small public amenity area through Old Alloa THI
(see Conservation and Environmental Enhancement proposal) |
Clackmannanshire Council/Scottish Enterprise Forth Valley/Heritage Lottery
Fund/Mar & Kellie Estates |
| CR7 |
Greenside Cemetery |
Potential to upgrade access and repair walling through Old Alloa THI
(see Conservation and Environmental proposal) |
Clackmannanshire Council/Heritage Lottery Fund |
| CR8 |
Kilncraigs Mill |
Retention and renovation of listed former office and warehouse buildings.
Retention/enhancement of prescribed archaeological/historical features.
High quality boundary treatments required. See Business Proposal 15 for
potential uses for the buildings. |
Clackmannanshire Council/College/ Scottish Executive/Scottish Enterprise
Forth Valley/Private |
| CR9 |
Autistic Centre |
Development of new facility. |
Scottish Society of Autism |
| CR10 |
Hawkhill |
Provision of new community centre to serve the Hawkhill area |
Hawkhill Community Association |
| Sauchie Proposal |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR11 |
Sauchie Hospital |
Redevelopment of the three sites to form a new integrated Community
Health Facility for Clackmannanshire. Subject to Development Brief. Transport
Assessment to be undertaken and localised junction improvements may be
required. Access from Parkhead Road. Existing cycle route/footpath along
former Alloa-Tillicoultry railway line to be retained and upgraded (See
Infrastructure Site 5). Existing mature trees to be retained where possible
and augmented with new planting. Boundary walls and Lodge to be retained.
Retention and re-use of original building within existing Sauchie Hospital. |
Forth Valley Primary Care NHS Trust |
| Tullibody Policy |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR12 |
Tullibody by-pass |
Provision of community woodland/ open space as part of future by-pass
development. In the event that the existing play area has to be relocated
onto all or part of the site as a consequence of development on Business
Site 20 or Housing Site 47, the location and design shall be open to ready
surveillance to residents and be secure from any business development
on adjacent land. |
Clackmannanshire Council |
| Tullibody Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR13 |
Muirside |
Provision of playing fields/kickabout areas as integral part adjoining
housing development (See Residential Sites 57-64) |
Private |
| CR14 |
Muirside |
Provision of community facilities as integral part of adjoining housing
development (See Residential Sites 57-64) |
Private |
CR15
|
Muirside |
Provision of kickabout area as integral part of adjoining housing development
(See Residential Sites 57-64) |
Clackmannanshire Council/Scottish Enterprise Forth Valley/Heritage Lottery
Fund/Mar & Kellie Estates |
| CR16 |
Muirside |
Provision of Community Woodland as integral part of adjoining housing
development (See Residential Sites 57-64) |
Clackmannanshire Council/Heritage Lottery Fund |
| CR17 |
Delph Wood |
Provision of Community Woodland as integral part of adjoining housing
development (See Residential Sites 54-56) |
Clackmannanshire Council/College/ Scottish Executive/Scottish Enterprise
Forth Valley/Private |
| CR18 |
Delph Wood |
Provision of all weather pitch and children’s play area as an
integral part of the adjoining housing development (See Residential Site
56) |
Scottish Society of Autism |
| CR19 |
Main Street, Cambus |
Enhancement of playing field / play area as an integral part of adjoining
housing development (See Residential Site 65 and 66) |
Hawkhill Community Association |
| Menstrie Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR20 |
Brook Street |
Environmental treatment of vacant ground and enhancement of Menstrie
Burn to form open space |
Clackmannanshire Council |
| CR21 |
Menstrie Burn |
Provision of new landscaped corridor with flood mitigation measures
to provide open spaces with structural planting in accord with agreed
Masterplan/Legal agreement for Menstrie Mains site. |
Private |
| Alva Policy |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR22 |
Former railway line |
Safeguard and enhance leisure route to be confirmed. Awaiting outcome
of current research |
Clackmannanshire Council |
| Alva Proposal |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR23 |
Lover’s Loan |
Provision of cemetery extension and car park |
Clackmannanshire Council |
| Tillicoultry and Coalsnaughton - Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR24 |
Coalsnaughton North |
Provision of toddler’s play area, re-orientation of existing playing
field, enhanced ground drainage and layout, provision of car parking,
upgrading of pavilion. Tree planting. Provision of Community Woodland.
To be implemented in accordance with a Masterplan and legal agreement
for Coalsnaughton North (See Residential Sites 102 and 103). |
Private |
| CR25 |
Coalsnaughton North |
Enhancement of existing woodland and burn corridors to form Community
Woodland. Structural planting as integral part of adjoining housing development
to be implemented in accordance with a Masterplan and legal agreement
for Coalsnaughton North (See Residential Sites 101 and 102) |
Private / Clackmannanshire Council |
| Tillicoultry and Coalsnaughton - Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR26 |
Tillicoultry Mains |
Provision of Community Woodland/ open space as integral part of adjoining
housing development (See Residential Site 99) |
Private |
| CR27 |
Dollar Road |
Provision of cemetery extension and car park |
Clackmannanshire Council |
| Dollar Proposal |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR28 |
The Ness |
Provision of kickabout pitch as integral part of adjacent housing development
(See Residential Site 104) |
Private |
| Countryside Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| CR29 |
Lornshill |
Development of enhanced community leisure facilities co-joined with
school recreational provision |
Clackmannanshire Council/Scottish Executive/Private |
| CR30 |
North West Alloa |
Provision of playing fields and woodland as integral part of adjoining
housing development |
Private |
| CR31 |
Tillicoultry West |
Provision of playing field(s) |
Clackmannanshire Council/Private |
| CR32 |
Kellyburn, Dollar |
Provision of playing field, accessed from Lovers. Protect and enhance
burn and introduce new structural planting. |
Clackmannanshire Council |
| CR33 |
School Road, Muckhart |
Extension of playing field and provision of children’s play area |
Clackmannanshire Council |
| CR34 |
Muckhart Golf Course |
Potential to extend golf course to provide a new nine hole course |
Muckhart Golf Club |
| CR35 |
Muckhart Cemetery |
Extension of cemetery (boundary to be defined) |
Clackmannanshire Council |
| CR36 |
Whiteyetts |
The development guidelines are as indicated in the Section 75 Legal
Agreement linked to the Whiteyetts housing site. |
Private |
B) Infrastructure – Schedule of Sites
| Alloa Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T1 |
Ring Road |
Improvement of pedestrian and cycle access across Ring Road in association
with development at the Alloa Brewery site, provision of a new rail station
and to link the Waggonway cycle/walkway and the Alloa/Sauchie cycle/walkway.
Demolition of existing masonry arch bridges and provision of new cycle/pedestrian
bridge(s) over the railway. Retain underpass at Bowling Club site for
pedestrian/cycle link. |
Rail Project Partners (See Proposal 7)/Private/Clackmannanshire Council |
| T2 |
Clackmannan Road Car Park |
Retention of car park for football ground |
Private/Clackmannanshire Council |
| T3 |
Fairfield Road/
Hallpark
|
Provision of junction improvements |
Private/Clackmannanshire Council |
| T4 |
Eastern Relief Road |
Construction of new single carriageway road linking A907 east of Clackmannan
Road Roundabout with Whins Road Roundabout. Involves the construction
of a new roundabout at the junction with the A907 and new road bridge
over the railway line with enlarged roundabout at Hilton Road/The Whins.
Hilton Road to be closed to through traffic at the former level crossing. |
Rail Project Partners (See Proposal 7)/Private/Clackmannanshire Council |
| Alloa Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T5 |
Alloa/Sauchie Cycle/walkway |
Upgrading of existing cycle/walkway between proposed railway station
and proposed community health facility at Sauchie, to provide improved
surfacing, lighting and drainage to enhance safety and access for pedestrians
and cyclists |
Clackmannanshire Council/ Forth Valley Primary Care NHS Trust |
| T6 |
Grange Road |
Closure of Grange Road/Stirling Road junction at former level crossing.
|
Clackmannanshire Council |
| T7 |
Stirling-Alloa-Kincardine Railway |
Proposed reopening of new Stirling-Alloa-Kincardine rail link:-
The provision of a passenger service to Alloa and freight to Longannet.
|
Clackmannanshire Council/Strategic Rail Authority/ Scottish Executive/Scottish
Enterprise National/ Scottish Enterprise Forth Valley/ScotRail/Railtrack/Fife
Council/Stirling Council |
| T8 |
New Railway Station |
Development of railway station with car park and improved pedestrian
links to the bus terminus. Access from Ring Road (south) and Parkway (north).
Petrol Filling Station may be incorporated within development. |
Strategic Rail Authority/ Scottish Executive/ Clackmannanshire Council |
| T9 |
High Street/Mill Street |
Pedestrian priority with environmental improvements |
Clackmannanshire Council |
| T10 |
Countryside Path Network/Cycle Route Network |
Completion of National Cycle Network route |
Clackmannanshire Council/Sustrans |
| Tullibody - Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T11 |
By-Pass |
Safeguarding of route for Tullibody By-Pass. |
Clackmannanshire Council/Private |
| T12 |
Dumyat |
Safeguarding rail freight line to Menstrie with potential for provision
of rail freight terminal. |
Clackmannanshire Council/Strategic Rail Authority/Private |
| T13 |
A907 |
Safeguard visibility splay for junction improvements to Cambus and provision
of pedestrian crossing associated with the new housing development and
the potential new railway halt. Introduction of traffic management measures.
|
Clackmannanshire Council/Private/SEFV/SE/
Scottish Power/Strategic Rail Authority
|
| T14 |
Station Road (East and West) |
Safeguarding for new station and platform, station car park and bus
stop/lay-by/bus turning circle in association with proposed Alloa-Stirling
rail link. |
Clackmannanshire Council/
Strategic Rail Authority/
Scottish Executive
|
| Tullibody - Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T15 |
Alloa/Stirling/ Kincardine Railway |
Re-opening of Stirling-Alloa-Kincardine rail link. |
Clackmannanshire Council / Strategic Rail Authority / Scottish Executive |
| T16 |
Delphwood |
Route for new distributor road |
Private |
| T17 |
Cycle Route/CCPN |
Provision of cycle route extension |
Clackmannanshire Council/
SESTRANS |
| Clackmannan -Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T18 |
Alloa Road |
Safeguarding for rail halt and car park |
Clackmannanshire Council/Strategic Rail Authority/Scottish Executive/ScotRail |
| T19 |
A907//B910 |
Junction Improvements at Helensfield |
Clackmannanshire Council |
| T20 |
Former Alloa-Oakley railway line |
Reopening of mineral branch line to Bogside, Fife |
Clackmannanshire Council/Scottish Enterprise Forth Valley/Scottish Executive/
Strategic Rail Authority/ Private |
| Clackmannan -Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T21 |
Stirling-Alloa-Kincardine Railway |
Reopening of Stirling-Alloa-Kincardine rail link |
Clackmannanshire Council/Strategic Rail Authority/ Scottish Executive/Scottish
Enterprise National/ Scottish Enterprise Forth Valley/ScotRail/Fife Council/Stirling
Council |
| T22 |
Clackmannanshire Countryside Path Network/Cycle Route Network |
Provision of cycle route extension |
Clackmannanshire Council/ Sustrans |
| Menstrie - Policy |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T23 |
New Bridge |
Safeguarded for a potential road link in accordance with legal agreement
for development to the west of mineral railway (Planning application Ref:
00/00129/OUT). |
Clackmannanshire Council/
Private |
| Menstrie - Proposals |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T24 |
Bridge at C101 |
Upgrading of carriageway with provision of footway crossing and traffic
controls. To be implemented as part of Menstrie Mains development (Planning
Application ref. 00/00029/OUT) |
Private |
| T25 |
Junction A91 and C101 |
Improvement to junction with realignment of A91 carriageway to provide
filter lanes to the C101. To be implemented as part of Menstrie Mains
development (Planning Application ref. 00/00029/OUT) |
Private |
| T26 |
A91 (west) |
Formation of new roundabout and Distributor Road as part of Menstrie
Mains development. To be implemented as part of Menstrie Mains development
(Planning Application ref. 00/00029/OUT) |
Private |
| Alva - Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T27 |
Stirling Street West |
Provision of traffic management measures (not site specific) |
Clackmannanshire Council |
| T28 |
Brook Street |
Provision of traffic management measures (not site specific) |
Clackmannanshire Council |
| Tillicoultry - Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T29 |
Blackfaulds Street |
Stopping off of Blackfaulds Street. Provision of traffic calming measures
at western entrance to Coalsnaughton.To be implemented in accordance with
a Masterplan and legal agreement for Coalsnaughton North (See Residential
Sites 102 and 103). |
Private/Clackmannanshire Council |
| T30 |
Mixed Leisure Route |
Upgrading of leisure route. |
Clackmannanshire Council |
| T31 |
A91/Lower Mill Street/Marchglen |
Junction improvement/bridge enhancement at A91/Lower Mill Street junction.
Traffic management measures at Marchglen required. (See Residential Site 97). |
Private |
| Dollar - Policy |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T32 |
Bridge Street |
Provision of traffic management measures combined with environmental
improvement |
Clackmannanshire Council/Dollar Civic Trust/ Private |
| Dollar - Proposal |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T33 |
Back Road/ Mylne Avenue/ McNabb Street/ Manor House Road |
Traffic management proposals including footway widening and vehicle
turning facility. |
Dollar Academy |
| Countryside - Policies |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T34 |
Stirling-Alloa-Kincardine Railway |
Formation of new Stirling-Alloa-Kincardine rail link |
Clackmannanshire Council/Strategic Rail Authority/ Scottish Executive/Scottish
Enterprise National/ Scottish Enterprise Forth Valley/ScotRail/Fife Council/Stirling
Council |
| T35 |
Tullibody By-pass/B9140 |
Safeguarding of route for Tullibody By-pass and B9140 for potential
realignment/improvement. |
Clackmannanshire Council |
| T36 |
Clackmannanshire Countryside Path Network |
Provision of section of National Cycle Network/safeguarding of route |
Clackmannanshire Council/SUSTRANS |
| T37 |
Upper Forth Crossing |
Safeguarding of line for road from new Upper Forth Crossing to Gartarry
Roundabout. Exact line of road to be defined by Scottish Executive (two
alternatives shown on Countryside Map) |
Scottish Executive |
| T38 |
Former Alloa-Oakley Railway |
Formation of mineral branch line to Bogside, Fife. Retention of mixed
leisure route. |
Clackmannanshire Council/Scottish Enterprise Forth Valley/Scottish Executive/
Strategic Rail Authority/ Private |
| Countryside - Proposal |
| Plan Ref |
Location |
Development Guidelines |
Potential Agency |
| T39 |
B908/B9140 |
Roundabout and road realignment (See Housing Site 7). |
Private |
Contact information
For further information about this page please contact:
Development Planning
Kilncraigs, Greenside Street, Alloa, FK10 1EB
Tel: 01259 450000 Fax: 01259 727453
Email: devplan@clacks.gov.uk
Or use the on-line contact form